Difference between revisions of "Hardware: PCB Assembly"

From HiveTool
Jump to: navigation, search
(Assembly)
(Assembly)
Line 21: Line 21:
 
##R6  1K
 
##R6  1K
 
#Install RJ1 and RJ2.  Be very careful to check that all the leads are in the holes before you snap it in place.
 
#Install RJ1 and RJ2.  Be very careful to check that all the leads are in the holes before you snap it in place.
#Install 1x4 and 1x6 male header.
+
#Install 1x4 and 1x6 male headers for the HX711 board.
#Install 1x4 and 1x6 female header on the make headers.
+
#Insert the 1x4 and 1x6 female headers on the make headers.
 
#Install the HX711 board on the 1x4 and 1x6 female headers.
 
#Install the HX711 board on the 1x4 and 1x6 female headers.
 
#Install LED D1.
 
#Install LED D1.
#Install C1.
+
#Install C1 4.7 mfd. Observe polarity.
#Install C3.
+
#Install C3 .1 mfd. for rain gauge filter.
 
#Install power supply if used.
 
#Install power supply if used.
  

Revision as of 13:57, 18 January 2016


Parts

Parts List

Mechanical Drawing for RJ connectors.

Board Layout

Assembly

  1. insert the 2x20 female header from the bottom side of the board.
  2. Solder the header on the top (component, silk screen) side of the board.
  3. Install the following resistors:
    1. R1 330
    2. R2 200K
    3. R3 1K
    4. R4 2.2K
    5. R5 2.2K
    6. R6 1K
  4. Install RJ1 and RJ2. Be very careful to check that all the leads are in the holes before you snap it in place.
  5. Install 1x4 and 1x6 male headers for the HX711 board.
  6. Insert the 1x4 and 1x6 female headers on the make headers.
  7. Install the HX711 board on the 1x4 and 1x6 female headers.
  8. Install LED D1.
  9. Install C1 4.7 mfd. Observe polarity.
  10. Install C3 .1 mfd. for rain gauge filter.
  11. Install power supply if used.

Power Supply 1

  1. Install four 1x2 male headers.
  2. Install blue screw terminal block.
  3. Install four 1x2 female headers on the four 1x2 male headers.
  4. Install the Power Supply board on the four 1x2 female headers.

power Supply 2

  1. Install Fulree voltage regulator
  2. Install green spring terminal block.

Testing